Uptower Inspection of Winergy PEAB 4425.4 Gearbox

Comprehensive uptower boroscopy inspection of a Winergy PEAB 4425.4 gearbox for Vestas V100 to assess internal condition without dismantling.

We performed a specialized uptower boroscopy inspection on a Winergy PEAB 4425.4 gearbox installed in a Vestas V100 wind turbine. With a power output of 2 MW, ensuring the operational integrity of this unit is crucial for maximizing energy production in the Czech region.

Our field service team executed a precise visual examination of the internal components—including high-speed bearings and planetary gears—directly within the nacelle. This non-intrusive diagnostic approach allows for the early detection of wear patterns and potential issues without the costly need for crane mobilization or gearbox removal. By providing a detailed condition report, we enabled the operator to plan maintenance proactively, minimizing downtime and extending the asset's lifecycle.

Project details

Gearbox make: Winergy
Type: PEAB 4425.4
Power in MW: 2
Architecture: Planetary-Helical
Industry: Wind Energy
Scope of work: Uptower boroscopy, condition assessment
Type of repair: Inspection / Diagnostics

Year: 2024
Country: Czech Republic

We are ready to help

Reach us via 24/7 hotline on WhatsApp or fill out our interactive on-line form and we will get back to you.

24/7 WhatsApp hotline

Contact us via form

Photo gallery