Detailed navigation
Complete refurbishment and upgrade of a 2.3 MW wind turbine gearbox, including planetary stage replacement and rigorous load testing.
We successfully executed a comprehensive overhaul and upgrade of a Winergy PEAB 4456.8 gearbox, a critical component for the Siemens 2.3 wind turbine platform. With a power rating of 2.3 MW, this unit operates under the highly dynamic and demanding conditions typical of the wind energy sector.
To restore the unit to peak performance, our team performed a complete change of the planetary stage gears and replaced all bearings throughout the system. The scope also included the refurbishment of the shrink-disk and essential accessories. Following the mechanical intervention, the gearbox underwent rigorous load testing to verify the repair quality, ensuring it meets the highest standards for reliability and efficiency before returning to operation in Romania.
Gearbox make: Winergy
Type: PEAB 4456.8 (Siemens 2.3)
Power in MW: 2.3
Architecture: Planetary
Industry: Wind Energy
Scope of work: Refurbishment, upgrade, load testing
Type of repair: Overhaul
Year: 2025
Country: Romania
Reach us via 24/7 hotline on WhatsApp or fill out our interactive on-line form and we will get back to you.